News

IR Team


Tel.: +7 (495) 710 9064
Е-mail: ir@fsk-ees.ru
Array ( [ID] => 346408 [~ID] => 346408 [NAME] => A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory [~NAME] => A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory [IBLOCK_ID] => 40 [~IBLOCK_ID] => 40 [IBLOCK_SECTION_ID] => [~IBLOCK_SECTION_ID] => [DETAIL_TEXT] =>

Ryumin, General Director of PJSC Rosseti, and Elena Parhomenko, Deputy Chairman of the Government of Primorsky Territory participated in the grand ceremony.

The length of the new 220 kV Lesozavodsk – Spassk – Dalnevostochnaya power transit line is 250 km. In addition to the line construction, the open switchgear of two key power transit line links – 220 kV Lesozavodsk and Spassk substations – were expanded.

Facilities designed for ensuring the reliability of power supply to consumers in the Primorsky Territory, including the two priority development areas "Mikhailovsky" and "Nadezhdinskaya", increasing the capacity of the network in the south of the region, are included in the national project – the Comprehensive Plan for Upgrading and Expanding the Trunk Infrastructure. The total volume of investments was 8.3 billion rubles.

"What effect do we get in the first place? A possibility for loading a railway substation to increase carrying and traffic-carrying capacity of the Eastern Landfill of Russian Railways is created according to the President's instructions, and conditions for increasing export are established as well. The second effect is an increase in the network complex capacity to transfer power to the south of Primorsky Territory and a possibility to connect new consumers, as well as an increase in the reliability of end users power supply", said the Minister.

"The new power transit line simultaneously solves several tasks having a high-priority significance for the development of the Far East. The project ensures the power supply of railroad infrastructure of the Eastern Landfill of Russian Railways, increases the reliability of power supply to the south of Primorsky Territory where Vladivostok and Nakhodka port area are located. In addition, power supply scheme for Eastern Siberia – Pacific Ocean oil pipeline is being optimized", noted Andrey Ryumin.

Microprocessor relay protection complexes and the state-of-art automated technological process control system have been implemented on Lesozavodsk, while the communications system and smart metering system equipment have been updated. As a part of Spassk facility modernization, a controlled shunt reactor and static capacitors batteries (167 MVAr) have been applied to reduce the reaction component and increase the quality of electric energy.

In general, to connect a new power transmission line, relay protection complexes have been upgraded and automated control systems have been introduced at eight associated facilities. Works on substations have been performed using equipment produced in Russia.

While constructing the power transmission line, a special crossing over the Ussuri river has been build (its length is 1,500 m, and the supports height is 67 m). Also, six crossings over oil and gas pipelines have been equipped. To connect the line, relay protection complexes and automated control systems have been upgraded.

[~DETAIL_TEXT] =>

Ryumin, General Director of PJSC Rosseti, and Elena Parhomenko, Deputy Chairman of the Government of Primorsky Territory participated in the grand ceremony.

The length of the new 220 kV Lesozavodsk – Spassk – Dalnevostochnaya power transit line is 250 km. In addition to the line construction, the open switchgear of two key power transit line links – 220 kV Lesozavodsk and Spassk substations – were expanded.

Facilities designed for ensuring the reliability of power supply to consumers in the Primorsky Territory, including the two priority development areas "Mikhailovsky" and "Nadezhdinskaya", increasing the capacity of the network in the south of the region, are included in the national project – the Comprehensive Plan for Upgrading and Expanding the Trunk Infrastructure. The total volume of investments was 8.3 billion rubles.

"What effect do we get in the first place? A possibility for loading a railway substation to increase carrying and traffic-carrying capacity of the Eastern Landfill of Russian Railways is created according to the President's instructions, and conditions for increasing export are established as well. The second effect is an increase in the network complex capacity to transfer power to the south of Primorsky Territory and a possibility to connect new consumers, as well as an increase in the reliability of end users power supply", said the Minister.

"The new power transit line simultaneously solves several tasks having a high-priority significance for the development of the Far East. The project ensures the power supply of railroad infrastructure of the Eastern Landfill of Russian Railways, increases the reliability of power supply to the south of Primorsky Territory where Vladivostok and Nakhodka port area are located. In addition, power supply scheme for Eastern Siberia – Pacific Ocean oil pipeline is being optimized", noted Andrey Ryumin.

Microprocessor relay protection complexes and the state-of-art automated technological process control system have been implemented on Lesozavodsk, while the communications system and smart metering system equipment have been updated. As a part of Spassk facility modernization, a controlled shunt reactor and static capacitors batteries (167 MVAr) have been applied to reduce the reaction component and increase the quality of electric energy.

In general, to connect a new power transmission line, relay protection complexes have been upgraded and automated control systems have been introduced at eight associated facilities. Works on substations have been performed using equipment produced in Russia.

While constructing the power transmission line, a special crossing over the Ussuri river has been build (its length is 1,500 m, and the supports height is 67 m). Also, six crossings over oil and gas pipelines have been equipped. To connect the line, relay protection complexes and automated control systems have been upgraded.

[DETAIL_TEXT_TYPE] => html [~DETAIL_TEXT_TYPE] => html [PREVIEW_TEXT] => Ryumin, General Director of PJSC Rosseti, and Elena Parhomenko, Deputy Chairman of the Government of Primorsky Territory participated in the grand ceremony. [~PREVIEW_TEXT] => Ryumin, General Director of PJSC Rosseti, and Elena Parhomenko, Deputy Chairman of the Government of Primorsky Territory participated in the grand ceremony. [PREVIEW_TEXT_TYPE] => text [~PREVIEW_TEXT_TYPE] => text [DETAIL_PICTURE] => Array ( [ID] => 168028 [TIMESTAMP_X] => 13.09.2021 17:08:04 [MODULE_ID] => iblock [HEIGHT] => 336 [WIDTH] => 505 [FILE_SIZE] => 78541 [CONTENT_TYPE] => image/jpeg [SUBDIR] => iblock/46d [FILE_NAME] => 46da6a8ee26c736574d7f60766f45fb5.jpg [ORIGINAL_NAME] => 96d50aa63bae2ac4e7a2c7fbb510848c.jpg [DESCRIPTION] => [HANDLER_ID] => [EXTERNAL_ID] => ad5de72e9b744d2fdc33845afd0390a7 [~src] => [SRC] => /upload/iblock/46d/46da6a8ee26c736574d7f60766f45fb5.jpg [UNSAFE_SRC] => /upload/iblock/46d/46da6a8ee26c736574d7f60766f45fb5.jpg [SAFE_SRC] => /upload/iblock/46d/46da6a8ee26c736574d7f60766f45fb5.jpg [ALT] => A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory [TITLE] => A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory ) [~DETAIL_PICTURE] => 168028 [TIMESTAMP_X] => 09/13/2021 05:08:04 pm [~TIMESTAMP_X] => 09/13/2021 05:08:04 pm [ACTIVE_FROM] => 09/05/2021 05:06:00 pm [~ACTIVE_FROM] => 09/05/2021 05:06:00 pm [LIST_PAGE_URL] => /eng/public_relations/news/ [~LIST_PAGE_URL] => /eng/public_relations/news/ [DETAIL_PAGE_URL] => /eng/public_relations/news/?ELEMENT_ID=346408 [~DETAIL_PAGE_URL] => /eng/public_relations/news/?ELEMENT_ID=346408 [LANG_DIR] => /eng/ [~LANG_DIR] => /eng/ [CODE] => [~CODE] => [EXTERNAL_ID] => 346408 [~EXTERNAL_ID] => 346408 [IBLOCK_TYPE_ID] => news [~IBLOCK_TYPE_ID] => news [IBLOCK_CODE] => eng_news_company [~IBLOCK_CODE] => eng_news_company [IBLOCK_EXTERNAL_ID] => 36 [~IBLOCK_EXTERNAL_ID] => 36 [LID] => en [~LID] => en [NAV_RESULT] => [DISPLAY_ACTIVE_FROM] => 09/05/2021 [IPROPERTY_VALUES] => Array ( ) [FIELDS] => Array ( ) [PROPERTIES] => Array ( [flag_main] => Array ( [ID] => 86 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Main news [ACTIVE] => Y [SORT] => 500 [CODE] => flag_main [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 104 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Main news [~DEFAULT_VALUE] => ) [flag_region] => Array ( [ID] => 87 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Region news [ACTIVE] => Y [SORT] => 500 [CODE] => flag_region [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 105 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Region news [~DEFAULT_VALUE] => ) [flag_investment] => Array ( [ID] => 88 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Investment newa [ACTIVE] => Y [SORT] => 500 [CODE] => flag_investment [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 106 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Investment newa [~DEFAULT_VALUE] => ) [flag_ir_release] => Array ( [ID] => 89 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => IR release [ACTIVE] => Y [SORT] => 500 [CODE] => flag_ir_release [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 107 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => IR release [~DEFAULT_VALUE] => ) [projects] => Array ( [ID] => 90 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Projects [ACTIVE] => Y [SORT] => 500 [CODE] => projects [DEFAULT_VALUE] => [PROPERTY_TYPE] => G [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 108 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Projects [~DEFAULT_VALUE] => ) [mes] => Array ( [ID] => 91 [TIMESTAMP_X] => 2019-07-29 13:20:49 [IBLOCK_ID] => 40 [NAME] => MES [ACTIVE] => Y [SORT] => 500 [CODE] => mes [DEFAULT_VALUE] => [PROPERTY_TYPE] => G [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => Y [XML_ID] => 109 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 12 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [~VALUE] => [~DESCRIPTION] => [~NAME] => MES [~DEFAULT_VALUE] => ) [mes_show_contacts] => Array ( [ID] => 92 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Show MES contacts [ACTIVE] => Y [SORT] => 500 [CODE] => mes_show_contacts [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 110 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => Y [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => 180896 [VALUE] => Yes [DESCRIPTION] => [VALUE_ENUM] => Yes [VALUE_XML_ID] => true [VALUE_SORT] => 500 [VALUE_ENUM_ID] => 18 [~VALUE] => Yes [~DESCRIPTION] => [~NAME] => Show MES contacts [~DEFAULT_VALUE] => ) [photo_gallery_id] => Array ( [ID] => 93 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Photoalbum [ACTIVE] => Y [SORT] => 500 [CODE] => photo_gallery_id [DEFAULT_VALUE] => [PROPERTY_TYPE] => S [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 111 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Photoalbum [~DEFAULT_VALUE] => ) [photo_gallery_items] => Array ( [ID] => 94 [TIMESTAMP_X] => 2019-07-29 10:51:17 [IBLOCK_ID] => 40 [NAME] => Photo [ACTIVE] => Y [SORT] => 500 [CODE] => photo_gallery_items [DEFAULT_VALUE] => [PROPERTY_TYPE] => E [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 112 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => N [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [HINT] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_SORT] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Photo [~DEFAULT_VALUE] => ) ) [DISPLAY_PROPERTIES] => Array ( ) [IBLOCK] => Array ( [ID] => 40 [~ID] => 40 [TIMESTAMP_X] => 08/03/2019 01:05:39 pm [~TIMESTAMP_X] => 08/03/2019 01:05:39 pm [IBLOCK_TYPE_ID] => news [~IBLOCK_TYPE_ID] => news [LID] => en [~LID] => en [CODE] => eng_news_company [~CODE] => eng_news_company [NAME] => News [~NAME] => News [ACTIVE] => Y [~ACTIVE] => Y [SORT] => 500 [~SORT] => 500 [LIST_PAGE_URL] => /eng/public_relations/news/?ID=40 [~LIST_PAGE_URL] => /eng/public_relations/news/?ID=40 [DETAIL_PAGE_URL] => #SITE_DIR#/public_relations/news/?ELEMENT_ID=#ID# [~DETAIL_PAGE_URL] => #SITE_DIR#/public_relations/news/?ELEMENT_ID=#ID# [SECTION_PAGE_URL] => #SITE_DIR#/public_relations/news/?SECTION_ID=#ID# [~SECTION_PAGE_URL] => #SITE_DIR#/public_relations/news/?SECTION_ID=#ID# [CANONICAL_PAGE_URL] => [~CANONICAL_PAGE_URL] => [PICTURE] => [~PICTURE] => [DESCRIPTION] => [~DESCRIPTION] => [DESCRIPTION_TYPE] => text [~DESCRIPTION_TYPE] => text [RSS_TTL] => 24 [~RSS_TTL] => 24 [RSS_ACTIVE] => Y [~RSS_ACTIVE] => Y [RSS_FILE_ACTIVE] => N [~RSS_FILE_ACTIVE] => N [RSS_FILE_LIMIT] => [~RSS_FILE_LIMIT] => [RSS_FILE_DAYS] => [~RSS_FILE_DAYS] => [RSS_YANDEX_ACTIVE] => N [~RSS_YANDEX_ACTIVE] => N [XML_ID] => 36 [~XML_ID] => 36 [TMP_ID] => [~TMP_ID] => [INDEX_ELEMENT] => Y [~INDEX_ELEMENT] => Y [INDEX_SECTION] => Y [~INDEX_SECTION] => Y [WORKFLOW] => N [~WORKFLOW] => N [BIZPROC] => N [~BIZPROC] => N [SECTION_CHOOSER] => L [~SECTION_CHOOSER] => L [LIST_MODE] => [~LIST_MODE] => [RIGHTS_MODE] => S [~RIGHTS_MODE] => S [SECTION_PROPERTY] => [~SECTION_PROPERTY] => [PROPERTY_INDEX] => [~PROPERTY_INDEX] => [VERSION] => 1 [~VERSION] => 1 [LAST_CONV_ELEMENT] => 0 [~LAST_CONV_ELEMENT] => 0 [SOCNET_GROUP_ID] => [~SOCNET_GROUP_ID] => [EDIT_FILE_BEFORE] => [~EDIT_FILE_BEFORE] => [EDIT_FILE_AFTER] => [~EDIT_FILE_AFTER] => [SECTIONS_NAME] => Разделы [~SECTIONS_NAME] => Разделы [SECTION_NAME] => Раздел [~SECTION_NAME] => Раздел [ELEMENTS_NAME] => Элементы [~ELEMENTS_NAME] => Элементы [ELEMENT_NAME] => Элемент [~ELEMENT_NAME] => Элемент [EXTERNAL_ID] => 36 [~EXTERNAL_ID] => 36 [LANG_DIR] => /eng/ [~LANG_DIR] => /eng/ [SERVER_NAME] => [~SERVER_NAME] => ) [SECTION] => Array ( [PATH] => Array ( ) ) [SECTION_URL] => [META_TAGS] => Array ( [BROWSER_TITLE] => [KEYWORDS] => [DESCRIPTION] => ) )

A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory

09/05/2021 A New Power Transit Line for the BAM and Transsib Power Supply Has Been Put Into Operation in the Primorsky Territory

Ryumin, General Director of PJSC Rosseti, and Elena Parhomenko, Deputy Chairman of the Government of Primorsky Territory participated in the grand ceremony.

The length of the new 220 kV Lesozavodsk – Spassk – Dalnevostochnaya power transit line is 250 km. In addition to the line construction, the open switchgear of two key power transit line links – 220 kV Lesozavodsk and Spassk substations – were expanded.

Facilities designed for ensuring the reliability of power supply to consumers in the Primorsky Territory, including the two priority development areas "Mikhailovsky" and "Nadezhdinskaya", increasing the capacity of the network in the south of the region, are included in the national project – the Comprehensive Plan for Upgrading and Expanding the Trunk Infrastructure. The total volume of investments was 8.3 billion rubles.

"What effect do we get in the first place? A possibility for loading a railway substation to increase carrying and traffic-carrying capacity of the Eastern Landfill of Russian Railways is created according to the President's instructions, and conditions for increasing export are established as well. The second effect is an increase in the network complex capacity to transfer power to the south of Primorsky Territory and a possibility to connect new consumers, as well as an increase in the reliability of end users power supply", said the Minister.

"The new power transit line simultaneously solves several tasks having a high-priority significance for the development of the Far East. The project ensures the power supply of railroad infrastructure of the Eastern Landfill of Russian Railways, increases the reliability of power supply to the south of Primorsky Territory where Vladivostok and Nakhodka port area are located. In addition, power supply scheme for Eastern Siberia – Pacific Ocean oil pipeline is being optimized", noted Andrey Ryumin.

Microprocessor relay protection complexes and the state-of-art automated technological process control system have been implemented on Lesozavodsk, while the communications system and smart metering system equipment have been updated. As a part of Spassk facility modernization, a controlled shunt reactor and static capacitors batteries (167 MVAr) have been applied to reduce the reaction component and increase the quality of electric energy.

In general, to connect a new power transmission line, relay protection complexes have been upgraded and automated control systems have been introduced at eight associated facilities. Works on substations have been performed using equipment produced in Russia.

While constructing the power transmission line, a special crossing over the Ussuri river has been build (its length is 1,500 m, and the supports height is 67 m). Also, six crossings over oil and gas pipelines have been equipped. To connect the line, relay protection complexes and automated control systems have been upgraded.


Back to the list